Planner
How long will it take?
Choose services and locations to see how planning stages fit together in an illustrative timeline.
–weeks
- Estimated go-live
- –
- Project close
- –
- Crews assumed by the model
- –
This tool uses illustrative assumptions. It is not a quote, a confirmed timeline or a crew-capacity commitment. Actual timing depends on scope and survey findings.
How do we estimate?
- Survey time grows with locations and cities, and is shorter for campaigns in known stores.
- Design, including prototypes, takes longer with the 3D, dealer and software arms.
- Production follows the longest selected arm; installation partly overlaps production.
- The illustrative model assumes 1 dealer or 6 stores per crew per day. The parallel scenario increases the modelled crew count by 50%; these are not verified capacity figures.