Planner

How long will it take?

Choose services and locations to see how planning stages fit together in an illustrative timeline.

Arms
Project type
–weeks
Estimated go-live
–
Project close
–
Crews assumed by the model
–
Use this plan in a brief

This tool uses illustrative assumptions. It is not a quote, a confirmed timeline or a crew-capacity commitment. Actual timing depends on scope and survey findings.

How do we estimate?
  • Survey time grows with locations and cities, and is shorter for campaigns in known stores.
  • Design, including prototypes, takes longer with the 3D, dealer and software arms.
  • Production follows the longest selected arm; installation partly overlaps production.
  • The illustrative model assumes 1 dealer or 6 stores per crew per day. The parallel scenario increases the modelled crew count by 50%; these are not verified capacity figures.